On June 3rd, 2022 Kit Carson Electric Cooperative (KCEC) and Guzman Energy celebrated the cooperative’s achievement of providing 100% of its daytime power with solar energy. The Taos Mesa 15 MW solar array and 12.5 MW battery storage project will provide members with reliable and low cost electricity.
Kit Carson Electric Cooperative (KCEC), Taos NM
KCEC has partnered with Guzman Energy since 2016. KCEC’s goals were to stabilize their wholesale cost of power; KCEC’s wholesale rates had been raised at least 10 times over the 12-year period preceding its exit from its legacy G&T supplier